VerySource

 Forgot password?
 Register
Search
View: 5746|Reply: 20

Just do project management, the software is going to be accepted, please enlighten me

[Copy link]

1

Threads

3

Posts

3.00

Credits

Newbie

Rank: 1

Credits
3.00

 China

Post time: 2020-2-6 12:00:01
| Show all posts |Read mode
I was doing project management for the first time, and now it is the final stage of software development. We need to sort out the software design ideas (due to the large differences from the early design and a lot of changes), as well as controlling the software integration progress, and many miscellaneous acceptance matters I am very confused. Please give me pointers, where should I start, and what other basic work to do? ?


Thank you all! !!
Reply

Use magic Report

0

Threads

1

Posts

2.00

Credits

Newbie

Rank: 1

Credits
2.00

 China

Post time: 2020-3-30 17:30:01
| Show all posts
Need to sort out the software design ideas (due to a large discrepancy from the early design, and a lot of changes),
-------------------------
????
Ready for acceptance?
In theory, this should be about to fail.
But our environment is like this, and we don't think this is a failure.
Or you may be too worried. The end is over, don't worry about so many bugs and defects
Make patches later, or upgrade
As long as the system is stable and the basic functions are similar,
Party A also wants to check and accept, finish early and make early delivery
I also do some junk software projects
Reply

Use magic Report

0

Threads

2

Posts

3.00

Credits

Newbie

Rank: 1

Credits
3.00

 China

Post time: 2020-4-2 02:45:01
| Show all posts
This is not tricky
Reply

Use magic Report

1

Threads

3

Posts

3.00

Credits

Newbie

Rank: 1

Credits
3.00

 China

 Author| Post time: 2020-4-4 12:00:02
| Show all posts
is it? I just feel confused, there are many places that need to be improved, I do n’t know where to start
Reply

Use magic Report

1

Threads

3

Posts

3.00

Credits

Newbie

Rank: 1

Credits
3.00

 China

 Author| Post time: 2020-4-4 14:45:01
| Show all posts
I ’m not afraid of Party A, but after all, I ’ve made software, and I should improve myself. I want to hear your experience, thanks
Reply

Use magic Report

0

Threads

2

Posts

3.00

Credits

Newbie

Rank: 1

Credits
3.00

 Invalid IP Address

Post time: 2020-4-20 15:30:01
| Show all posts
Still don't know what LZ wants?
The ability to express and communicate needs to be improved.
Reply

Use magic Report

0

Threads

1

Posts

2.00

Credits

Newbie

Rank: 1

Credits
2.00

 China

Post time: 2020-5-1 21:45:01
| Show all posts
It ’s actually very simple, write all the things to be done on a piece of paper, and see which problems must be solved, which can be solved after waiting, and which can not be solved. Successively, and then distribute the work according to the actual situation of the project team, I do n’t think it will be a problem. However, I still recommend that the landlord communicate with the customer first, in fact, the so-called acceptance, as long as the customer is satisfied. In addition, I feel that there is no need at this time and there is no need to sort out the previous things. After the acceptance, let me talk about it, or find a way to solve the current main problem.
Reply

Use magic Report

0

Threads

1

Posts

2.00

Credits

Newbie

Rank: 1

Credits
2.00

 China

Post time: 2020-7-19 22:15:01
| Show all posts
Actively mobilize various resources of customers and the company!
Reply

Use magic Report

0

Threads

2

Posts

2.00

Credits

Newbie

Rank: 1

Credits
2.00

 China

Post time: 2020-8-7 11:15:01
| Show all posts
List the things that must be provided for project acceptance, check the completion status of each item according to the acceptance criteria, and formulate a completion plan for each item according to the status, allocate the corresponding completion resources, and promote the degree.

Need to sort out the design ideas of the software (because it is very different from the earlier design, many changes)?
I don’t know if the design idea has been changed, or it needs to be revised now? Think about it, what does this have to do with acceptance? The design idea is usually something inside the project development, and it is not directly reflected in the acceptance.
Reply

Use magic Report

0

Threads

1

Posts

2.00

Credits

Newbie

Rank: 1

Credits
2.00

 China

Post time: 2020-8-11 12:15:01
| Show all posts
Haha, you can invite customers and project team to dinner
Reply

Use magic Report

You have to log in before you can reply Login | Register

Points Rules

Contact us|Archive|Mobile|CopyRight © 2008-2023|verysource.com ( 京ICP备17048824号-1 )

Quick Reply To Top Return to the list